Change the conditions of provisional consent B-4-2022 given on March 16th, 2022, by:
1) adding the following condition to the list of conditions under Schedule “A” of the Decision: “That the applicant initiate and complete work under Section 4 under the Drainage Act to the satisfaction of the Municipality. This is required to create a subsequent connection into the Croson Drain (a municipal drainage system) located on the south side of South Middle Road. The subsequent connection is required to span the length of the frontage of all three lots and shall be completed prior to the stamping of the deed(s). All requirements of the Drainage Superintendent shall be completed prior to the stamping of the deed(s).";
2) amending current condition numbered “9” to Schedule “A” of the Decision by replacing it with the following condition: “That all conditions be met in accordance with Section 53 (41) of the Planning Act, R.S.O. 1990, c. P.13”;
3) giving notice of the changes to the conditions of provisional consent B-4-2022 in accordance with subsection 53 (24) of the Planning Act.