Approve Consent Application B/09/2023 to sever a surplus dwelling with a lot area of 7,600.00 m2 from 3776 Comber Sdrd as in Parts 1 & 2 on the draft 12R plan provided. Subject to the following conditions:
1) That the applicants obtain a proper survey and Reference Plan from an Ontario Land Surveyor for the severed and retained parcel of land to the satisfaction of the Municipality, including setbacks of any buildings, septic systems, and existing entrances;
2) That all municipal taxes be paid in full prior to the stamping of the Deed;
3) That the Deed and a copy for our records be forwarded to the Secretary for stamping;
4) That the applicants obtain a Zoning By-law amendment respecting the remnant farm parcel to prohibit the construction of a residential dwelling and to recognize the deficient lot area, and the surplus lot be rezoned to recognize the non-farm use;
5) That the applicant submit a drawing detailing the surface and subsurface drainage for the entire lands, to the Municipality’s satisfaction, prior to the stamping of the Deeds;
6) That the applicants obtain any necessary driveway permits from the County of Essex and complete the works to provide a separate access for the retained farmland prior to the stamping of the deed;
7) That the applicant complete the septic test report attached to the consent application to the satisfaction of the Municipality for both lots to be severed, and if required, install a new septic system on the severed lots to the satisfaction of the Municipality, prior to the stamping of the Deeds;
8) That the applicants enter into an Agreement with the Municipality prior to the stamping of the Deed regarding the apportionment of any current or future local improvements or drainage charges levied against the subject property;
9) That a Park Fee be imposed on the granting of this Application in the amount subjected by the Parkland By-law at the time of payment, and that such fee shall be paid prior to the stamping of the Deed;
10) That all conditions be met in accordance with Section 53(41) of the Planning Act, R.S.O. 1990 by May 17, 2025. Failure to fulfil the conditions by this date, shall deem the consent refused, as per The Planning Act.